1 min read
Multi-room cold store build — Dubai
Multi-chamber cold store under construction. Insulated panel walls erected, door frames set and openings formed ahead of refrigeration installation and commissioning.
Multi-chamber cold store under construction. Insulated panel walls erected, door frames set and openings formed ahead of refrigeration installation and commissioning.
Nine reasons cold rooms fail in the UAE — from 35°C-rated condensers to broken vapour barriers — and why almost all of them are…
MARPOL Annex VI Regulation 12 bans new HCFC equipment on ships built from 2020 and requires an ODS Record Book. What that means for…
Dubai Municipality requires cooked food to cool from 60°C to 21°C in 2 hours, then to 5°C in 4 more. Why walk-in chillers can't…