Completed cold room — twin ceiling unit coolers
Insulated PU panel construction with twin ceiling-mounted unit coolers positioned for even air distribution, tidy pipework routing and a sealed hygienic finish throughout.
Insulated PU panel construction with twin ceiling-mounted unit coolers positioned for even air distribution, tidy pipework routing and a sealed hygienic finish throughout.
Multi-chamber cold store under construction. Insulated panel walls erected, door frames set and openings formed ahead of refrigeration installation and commissioning.
Hinged cold room door frame fitted and sealed into the panel opening, with heavy-duty hinges and locking hardware set for a full thermal seal.
Air curtain mounted above a high-traffic cold room opening. Controlling infiltration at the door is one of the cheapest ways to protect temperature stability and cut running cost.
Twin-fan evaporator mounted and connected in a completed cold room, positioned for clear air throw down the length of the chamber.
Evaporator drain routing and insulated suction lines through the panel ceiling. Correct drainage and trap detailing is what stops ice on the floor and water where it shouldn't be.