Marine & Offshore HVAC-R · All UAE Ports · 24/7

Marine Refrigeration & Air Conditioning Service at Every UAE Port

Chillex repairs, overhauls, converts and maintains HVAC-R systems on vessels and offshore assets
across the UAE — air conditioning plants, provision plants, reefer and cargo cooling, and marine
compressors. Attendance alongside, at anchorage, or in yard, scheduled around your sailing date.

  • anchorAll UAE ports — Jebel Ali, Port Rashid, Hamriyah, Khor Fakkan, Port Khalid, Fujairah, Khalifa Port, Mina Zayed and anchorages
  • autorenewRefrigerant conversion specialists — R12 and R22 to R134a, R407c, R404a and R417a, with documentation for your ODS Record Book
  • schedule24/7 mobilisation — we plan around your ETA and ETD, not our office hours

Request a Callback

We reply the same working day. In a breakdown, call +971 50 988 6428 instead — it is faster.

By submitting this form you agree that Chillex Technical Services LLC may contact you about your enquiry. We keep your details to ourselves and never share or sell them. Privacy policy

Coverage

Where We Attend

West coast — Arabian Gulf

Jebel Ali · Port Rashid · Dubai Maritime City · Dubai Creek · Port Khalid (Sharjah) · Hamriyah · Ajman · Umm Al Quwain · Mina Saqr · Khalifa Port · Mina Zayed · Musaffah

East coast — Gulf of Oman

Port of Fujairah · Fujairah Anchorage · Khor Fakkan

Around 12,000 vessels call at Fujairah each year and the anchorage holds up to 174 vessels at a time.

Offshore

Offshore support vessels, rigs, platforms and onshore marine facilities in UAE waters.

Attendance types

  • Alongside — berth attendance
  • At anchorage — where arrangements allow
  • In yard / drydock — extended scopes and conversions

Systems We Work On

Air conditioning plants

  • Accommodation AC — DX and chilled water
  • Self-contained and split units
  • Fan coil units and air handling units
  • ECR and cargo control room cooling
  • Ventilation, filtration and pressurisation

Provision refrigeration

  • Provision plants — chilled and frozen rooms
  • Vegetable, meat, fish and dairy rooms
  • Compressors and condensing units
  • Evaporators, defrost and drainage
  • Controls, thermostats and alarms

Cargo & reefer

  • Refrigerated cargo hold plant
  • Brine and glycol systems
  • Cargo temperature control and logging

Compressors

  • Open-drive, semi-hermetic and screw
  • Overhaul, rebuild and reconditioning
  • Valve, bearing, shaft seal and gasket renewal
  • Seawater condenser cleaning and tube work
  • Pumps, motors and starters
Compliance

R12 & R22 Conversion — Done Properly, Documented Properly

The regulatory position

Under MARPOL Annex VI, Regulation 12, installation of equipment containing ozone-depleting substances — including R22 — is prohibited on ships constructed on or after 1 January 2020. Every vessel must maintain a list of equipment containing ODS and an ODS Record Book, recording each servicing, maintenance, repair or disposal action affecting that equipment.

If your vessel is still operating on R22, you're carrying a compliance exposure, a documentation obligation, and a conversion cost that gets no cheaper by waiting.

We are one of a limited number of companies in the UAE with the knowledge and experienced staff to carry out these conversions across marine, offshore, oil and gas, industrial and commercial assets.

A conversion done properly covers

  • System assessment — condition, capacity, component compatibility
  • Oil compatibility — mineral to POE/alkylbenzene changeover and flushing
  • Component changes — expansion devices, seals, gaskets, driers
  • Recovery and lawful disposal of the existing charge
  • Recharge, leak test and pressure test
  • Performance verification against the duty, not just "it runs"
  • Documentation for your ODS Record Book, class file and PSC inspection

Why the detail matters. A conversion done as a drop-in gas swap will run — for a while. Then it loses capacity, the oil doesn't return, the compressor starves and you have a failure in a place where failures are expensive. The engineering around the gas change is the job. The gas change is the easy part.

Diagnostics

What We Get Called For

Seawater condenser fouling

The defining marine failure. Biofouling, slime, marine growth and salt deposition build on the seawater side, particularly in warm tropical waters — and Gulf waters are as warm as they get. A fouled condenser raises high-side pressure, trips the plant on HP, drops capacity and overworks the compressor.

Compressor faults

Valve leaks, worn bearings, shaft seal leakage, motor overload, high discharge temperature, oil carry-over. We overhaul and rebuild rather than automatically replace — often the difference between sailing on schedule and waiting on a spare.

Refrigerant leaks and loss of charge

Leak detection, repair, recovery and recharge. Where a system leaks repeatedly, we'll say so rather than selling you gas twice a year — and on an ODS system, repeated top-ups also mean repeated Record Book entries.

Loss of temperature in provision rooms

Defrost faults, evaporator icing, drainage blockage, door seal failure, control drift, thermostat and sensor faults.

Plant tripping on safeties

HP/LP trips, oil differential, motor protection, phase failure. A plant cutting out on a safety is protecting itself — the fault is what's driving it there.

Marine provision plant reciprocating compressor with pressure gauges and safety controls Chillex technician inspecting a marine refrigeration compressor on board a vessel Two Chillex engineers carrying out preventive maintenance on a vessel refrigeration plant Marine reciprocating refrigeration compressor and receiver assembly in a vessel engine room

How to Get Us on Board

01

Send the vessel details

Vessel name, IMO number, port or anchorage, ETA and ETD, the system affected and what it's doing. WhatsApp, email or phone — whichever is fastest, any hour.

02

We confirm mobilisation

We tell you straight away whether we can make your window, what we'd bring, and what it will take. If we can't make it, we'll say so immediately rather than leaving you to discover it on the day.

03

We attend and report

Our team attends alongside, at anchorage or in yard, works to your permit-to-work system, completes the scope, and hands over a written report with readings and actions.

Send this and we can quote immediately

  • Vessel name and IMO number
  • Port or anchorage, ETA and ETD
  • System affected — AC plant, provision plant, reefer, cargo, compressor
  • Make and model if known, and the refrigerant in use
  • Fault description — what it's doing, what alarms or trips, when it started
  • Photographs of the plant, nameplate and any fault codes
  • Agent details and who is arranging launch, gate passes and permits
  • Spares already on board, if any
Send It All on WhatsApp
Fleet Programmes

Planned Maintenance, Not Just Breakdowns

Breakdown attendance is expensive, disruptive and always badly timed. For operators with vessels calling the UAE regularly, we run planned HVAC-R maintenance programmes scheduled around your trading pattern.

  • Attendance planned around your rotation — work carried out on port calls you're already making
  • Condition monitoring of compressors, condensers and controls
  • Seawater condenser cleaning on schedule
  • Refrigerant leak management and ODS Record Book support
  • Spares planning — what to carry, what we hold ashore
  • Consistent reporting format across the fleet, for your PMS and technical files
  • Ship and shore under one supplier
Why Chillex

Why Technical Managers Use Us

Conversion capability

R12 and R22 to R134a, R407c, R404a and R417a — a scope few contractors in this region are genuinely equipped to deliver.

We overhaul, not just replace

In-house compressor overhaul, motor rewinding and rebuilt compressor supply. When a spare is weeks away, a rebuild is the difference between sailing and waiting.

Ship and shore

We design and build industrial refrigeration and chiller plant ashore as well. Very few marine contractors can cover both.

We work to your window

Sailing dates don't move for contractors. Attendance is planned around ETA and ETD, at whatever hour that means.

FAQ

Marine Service Questions

Request Attendance
Yes, where port arrangements permit. Fujairah anchorage in particular is a position we plan for regularly — tell us whether launch and passes are being arranged by your agent or by us.
Yes — R12 and R22 to R134a, R407c, R404a and R417a, including system assessment, oil changeover, component changes, recovery, recharge, performance verification and full documentation for your ODS Record Book.
MARPOL Annex VI Regulation 12 prohibits installing HCFC-containing equipment on ships constructed on or after 1 January 2020, and requires every ship to maintain an ODS equipment list and Record Book. Existing R22 systems carry an ongoing documentation obligation and a conversion that becomes more expensive the longer it's deferred. We'll assess your specific position honestly — including telling you if conversion isn't yet the right call.
Yes — in-house overhaul, rebuild and reconditioning, including valves, bearings, shaft seals, gaskets and motor rewinding. Where a replacement unit has a long lead time, this is often the fastest route back to service.
Yes. Extended scopes, overhauls and conversions are best done in yard, and we plan them into the docking programme.
Yes — a written report covering findings, work carried out, readings and test results, suitable for your PMS, class file and ODS Record Book.
Yes, and we hold stock ashore in Dubai. Send the nameplate details and we'll confirm availability.

Send Us the Vessel, the Port and the ETA

We'll confirm whether we can make your window — usually the same day.

Chat on WhatsApp